Plant & Production Facility Relocation Services

When the whole floor moves, the order is everything. We relocate production lines, machine cells, process equipment, and entire facilities — survey, scope of work, teardown, sequenced freight, reinstall, re-level — planned so your line is down only for the move window, not a day longer.

DOWNTIME — MINIMIZED SEQUENCE 1 → 48 TAGGED & MAPPED LINE BACK UP →
TAG & MAP SEQUENCE FIRST NEW PAD READY?

Quick answer: Plant relocation — also called production facility relocation — is the sequenced move of a manufacturing or process facility with minimal downtime: survey and asset list, a written scope of work, disconnect and teardown, rigging and freight between sites, and reinstall and re-level in the new layout. Badass Logistics runs all of it as one project with one accountable team, not separate rigging, transport, and installation contracts. A plant relocation quote is built from your asset list, both floor plans, the distance between sites, and your production start-up date — send those and we return a written scope of work and quote before anything is scheduled.

One team owns the whole relocation

A plant move isn't one big lift — it's dozens or hundreds of moves in the right order. Disconnect, teardown, crating, freight, reinstall, recommission. Get the sequence wrong and the new floor sits half-built while production bleeds. Badass Logistics runs the entire project with one accountable team, so nothing falls into the cracks between the rigger, the trucking company, and the installer.

That gap is the single biggest reason a production facility relocation runs long. When rigging, freight, and installation are three separate contracts, no one owns the sequence — the rigger stages crates and moves on to the next job, the truck arrives on its own schedule instead of the install crew's, and if a machine shows up damaged or short a part, three vendors point at each other while your line stays down. One scope of work with one contractor removes that handoff entirely.

We map the path of travel and floor loading at both sites, tear down and label, crate and prep what needs it, and run the loads as project freight on dedicated lanes timed to the crew. At the new building our rigging and machinery moving crews rig and set every machine back to spec in the new layout, with millwright reinstall and alignment on the machines that need it — including the precision CNC machines that have to come back holding tolerance.

New to planning a facility move? Start with our plant relocation checklist, then see how we handle the tricky pieces like re-leveling machines to spec at the new site.

Plant & project relocation

production lines

Full Production Lines

Sequenced teardown, freight, and reinstallation of complete lines.

machine cells

Machine Cells

Multi-machine cells relocated and re-leveled in the new layout.

process

Process Plant Relocation

Tanks, mixers, skids, piping runs, and continuous-process equipment moved and reset in sequence.

utilities

Plant Utilities

Compressors, dust collection, conveyors, and the support gear that moves with the line.

consolidation

Multi-Site Consolidation

Two floors consolidated into one, or production split out to a new building.

removal

Decommissioning

Equipment that isn't making the trip rigged out cleanly so the old building can be handed back.

staging

Storage & Staging

Equipment secured and staged when the new floor isn't ready yet.

TRUCK 7 OF 22 LOTO ✓ PHASE 2

Planned backward from your start-up date

Every relocation plan we build starts at the end: the day the first line has to run in the new building. From there we work backward — which machines are needed first, which utilities have to be live before they land, which pads and anchors have to be ready, and how many days each teardown and reinstall really takes.

What gets surveyed

Both buildings get walked and measured before anything is scheduled: every machine's weight, footprint, and utility drops; floor loading and slab condition along the path of travel and at the new pad; doorway, aisle, and ceiling clearances; crane hook height and dock access at both ends; and where the new floor plan puts each machine relative to power, air, and process piping. That survey becomes the asset list that drives the rigging plan, the crating plan, and the truck count.

The disconnect and reconnect boundary

Every machine on the asset list gets a clear line drawn around it: what we disconnect and reconnect as part of the move, and what stays with your electricians, controls integrator, or the OEM's own field techs. Mechanical disconnect, rigging, transport, and mechanical reinstall — setting, anchoring, and leveling — run on our schedule. Utility drops, controls tie-ins, and any startup that requires the OEM's own technician are written into the plan up front and sequenced around our crew, not discovered on move day.

Phased move or single shutdown

Most plants can't go dark for the whole move, so we plan phase by phase — often line by line or department by department — so part of production keeps running at the old site while the first lines come up at the new one. A single shutdown, where the whole facility comes down at once, is faster end to end but only works when the production calendar allows it and the receiving building is fully ready on day one. We lay out both options against your asset list and start-up date so the trade-off is a decision, not a guess.

Documentation and labeling discipline

Every cable, hose, guard, and fastener gets tagged and photographed before it comes off, cross-referenced to the machine's position on the new floor plan. Floor plan revisions, the asset list, and the punch list are kept as one live set of documents through the whole project, not separate paperwork per vendor. Reassembly at the new site should be a checklist against that record, not a crew trying to remember how something came apart.

UTILITIES OFF REINSTALL ORDER FLOOR PLAN REV C

What a production facility relocation service includes

A written scope of work is what separates a plant relocation from three vendors doing their own piece of it. Before a single machine moves, the scope of work lays out the asset list with weights, dimensions, and destinations; the disconnect/reconnect boundary for every machine; the rigging plan and equipment needed at both ends; the freight plan and load sequence; the crating and packaging standard for anything shipped; the phased or single-shutdown schedule tied to your start-up date; and the reinstall and leveling spec each machine has to meet before it's handed back.

That scope is what keeps rigging, freight, and installation from becoming three separate contracts with three separate schedules. When one contractor owns the whole scope, a delay in teardown adjusts the freight schedule automatically instead of leaving trucks waiting or crews standing around a machine that hasn't arrived — and if something needs to be re-sequenced mid-project, there's one plan to change, not three.

PUNCH LIST ✓ DAY 1 — TEARDOWN FIRST PART OFF

Where rigging meets project freight

A relocation is the clearest example of why we run freight at all. Between the rig-out and the rig-in, you might have dozens of truckloads of machines, crated parts, racking, and tooling that all need to arrive in a specific order — not whenever a truck happens to be available.

So the freight is planned with the rigging. Loads are built around weight, dimensions, and install order. Equipment types are matched to the freight — air-ride for precision machines, open deck for tall or crane-loaded pieces, enclosed for crated parts. Transport runs through our licensed broker and carrier partners, usually on dedicated lanes for the length of the move, so the same trucks cycle between sites on a schedule the crews can plan around.

For equipment coming in from overseas or out of storage, we handle container-to-warehouse receiving and staging as part of the same project.

TAG & MAP SEQUENCE FIRST NEW PAD READY?

When two plants become one

A consolidation is a different planning problem than a single-site relocation. Instead of one asset list moving into one empty building, you're often merging two live production floors — sometimes with overlapping or duplicate equipment — into a receiving building that has to hold both floor plans without exceeding its own floor loading, utility capacity, or aisle widths.

The survey has to answer questions a single relocation doesn't: which duplicate machines actually make the trip and which are decommissioned, how the two production schedules interleave so neither site goes fully dark before the other is ready, and how the combined asset list fits the new building's layout without recreating the bottlenecks either original floor had. We plan consolidations the same way — asset list, scope of work, sequenced rigging and freight, reinstall — but the sequencing has two source floors to reconcile instead of one.

TAG & MAP SEQUENCE FIRST NEW PAD READY?

What a plant relocation quote is built from

A plant relocation quote isn't a per-mile rate — it's a project estimate built from the same information that becomes the scope of work. Send us the asset list (or let us survey and build one), the floor plans for both the current and receiving buildings, the distance between sites, your production start-up date, and whether the move needs to be phased or can run as a single shutdown.

From there the process is straightforward: a survey call or site walk to confirm the asset list and both floor plans, a written scope of work covering the disconnect/reconnect boundary, the rigging and freight plan, and the reinstall spec, then a project quote against that scope — not a rough estimate that changes once the crew is on site.

PUNCH LIST ✓ DAY 1 — TEARDOWN FIRST PART OFF

How a plant relocation runs

  1. Survey & sequenceBoth sites measured; the order every machine comes down and goes back up is planned before teardown.
  2. Disconnect & teardownCoordinated lockout, OEM prep, and label-and-map so reassembly goes by the book.
  3. Crate, load & moveMachines prepped or crated, loaded in install order, and moved as project freight on scheduled partner capacity.
  4. Reinstall in the new layoutRigged, set, anchored, leveled, and squared to spec — line by line.
  5. Recommission & hand offA floor that's ready to run, with a punch list closed out on the schedule we agreed.

Relocations we plan

Manufacturing plantsMachine shopsAutomotive suppliersPlastics & moldingProcess & continuous-flow plantsFood & beveragePharma & biotechPrinting & packagingElectronics assemblyDistribution centersLabs & R&D facilitiesReshoring & nearshoring moves

Plant relocation FAQ

What does a production facility relocation service include?
A survey and asset list, a written scope of work covering the disconnect/reconnect boundary, the rigging plan, the freight plan, and the reinstall spec, then execution as one project: teardown, sequenced freight, and reinstall and re-leveling to spec — run by one contractor instead of separate rigging, transport, and installation vendors.
What information do you need to give a plant relocation quote?
The asset list (or a survey to build one), floor plans for both the current and receiving buildings, the distance between sites, your production start-up date, and whether the move needs to be phased or can run as a single shutdown. That becomes the scope of work the quote is built against.
How do you keep downtime short on a plant move?
The whole project is planned before teardown — path of travel, floor loads, machine sequence, and a phased schedule built around your production calendar, so each line is down only for its move window.
What's the difference between a phased move and a single shutdown?
A phased move relocates lines or departments one at a time so part of production keeps running while the rest transitions. A single shutdown takes the whole facility down at once — faster overall, but only workable when the production calendar allows it and the receiving building is fully ready on day one.
How is a multi-site consolidation different from a single relocation?
Consolidation means reconciling two live production floors — and often duplicate equipment — into one receiving building without exceeding its floor loading, utility capacity, or aisle widths, instead of moving one asset list into an empty building.
Who handles utility disconnect and reconnect?
We draw the boundary on the asset list up front: mechanical disconnect, rigging, transport, and mechanical reinstall run on our schedule, while utility drops, controls tie-ins, and any OEM-required startup are sequenced with your electricians, controls integrator, or the equipment builder's own field techs.
Can you relocate a full production line?
Yes — single lines, machine cells, and complete facilities, including disconnect, labeling, crating, freight, reinstallation, and re-leveling to spec.
How is the freight handled on a plant relocation?
As project freight: loads planned in install order and moved through our licensed broker and carrier partners, usually on dedicated lanes for the length of the move, timed to the rigging crews at both ends.
How long does a plant relocation take?
It depends on the number of machines, the distance, and how much reinstall and utility work the new building needs. We build the timeline from your asset list during the survey.
Do you remove the equipment we're leaving behind?
Yes. Equipment that isn't moving can be rigged out and decommissioned so the old building is ready to hand back.
Do you cover my area?
We run relocations from 88 locations and cover all 50 states, including moves between states. See locations →

Related services

Straight answers from our blog

PHASE 2 OF 4 ✓ LINE BACK UP →

Where we relocate plants

Plant and factory relocation in the country's biggest manufacturing markets — including moves between them. Our own crews and rigging gear, backed by a nationwide network of 88 locations.

// CA

Los Angeles, CA

Long Beach · Anaheim · Santa Ana

Los Angeles plant relocation
// CA

Bakersfield, CA

Oildale · Shafter · Wasco

Bakersfield plant relocation
// CA

Sacramento, CA

Roseville · Elk Grove · Folsom

Sacramento plant relocation
// OR

Portland, OR

Gresham · Hillsboro · Beaverton

Portland plant relocation
// WA

Seattle, WA

Tacoma · Bellevue · Kent

Seattle plant relocation
// WA

Spokane, WA

Spokane Valley · Liberty Lake · Cheney

Spokane plant relocation
// ID

Boise, ID

Nampa · Meridian · Caldwell

Boise plant relocation
// UT

Salt Lake City, UT

West Valley City · Sandy · Ogden

Salt Lake City plant relocation
// NV

Las Vegas, NV

Henderson · North Las Vegas · Paradise

Las Vegas plant relocation
// AZ

Phoenix, AZ

Mesa · Chandler · Glendale

Phoenix plant relocation
// NM

Albuquerque, NM

Rio Rancho · Santa Fe · Los Lunas

Albuquerque plant relocation
// CO

Denver, CO

Aurora · Lakewood · Commerce City

Denver plant relocation
// WY

Casper, WY

Mills · Evansville · Glenrock

Casper plant relocation
// MT

Billings, MT

Laurel · Lockwood · Shepherd

Billings plant relocation
// ND

Fargo, ND

West Fargo · Moorhead, MN · Dilworth, MN

Fargo plant relocation
// NE

Omaha, NE

Council Bluffs, IA · Bellevue · Papillion

Omaha plant relocation
// MN

Minneapolis, MN

St. Paul, AK · Bloomington · Brooklyn Park

Minneapolis plant relocation
// WI

Milwaukee, WI

Waukesha · West Allis · Wauwatosa

Milwaukee plant relocation
// MO

Kansas City, MO

Overland Park, KS · Olathe, KS · Independence

Kansas City plant relocation
// MO

St. Louis, MO

St. Charles, IL · Chesterfield · Florissant

St. Louis plant relocation
// IL

Chicago, IL

Joliet · Aurora · Naperville

Chicago plant relocation
// IN

Indianapolis, IN

Carmel · Fishers · Greenwood

Indianapolis plant relocation
// MI

Detroit, MI

Warren · Dearborn · Livonia

Detroit plant relocation
// OH

Columbus, OH

Dublin · Westerville · Grove City

Columbus plant relocation
// OH

Cleveland, OH

Parma · Akron · Lorain

Cleveland plant relocation
// KY

Louisville, KY

Jeffersonville, IN · New Albany, IN · Shepherdsville

Louisville plant relocation
// TX

Houston, TX

Pasadena · Baytown · Pearland

Houston plant relocation
// TX

Dallas, TX

Fort Worth · Arlington · Irving

Dallas plant relocation
// TX

San Antonio, TX

New Braunfels · Schertz · Converse

San Antonio plant relocation
// TX

Midland, TX

Odessa · Big Spring · Andrews

Midland plant relocation
// OK

Oklahoma City, OK

Norman · Edmond · Moore

Oklahoma City plant relocation
// AR

Little Rock, AR

North Little Rock · Conway · Benton

Little Rock plant relocation
// LA

New Orleans, LA

Metairie · Kenner · Gretna

New Orleans plant relocation
// MS

Jackson, MS

Pearl · Ridgeland · Madison

Jackson plant relocation
// TN

Memphis, TN

Bartlett · Germantown · Collierville

Memphis plant relocation
// TN

Nashville, TN

Murfreesboro · Franklin · Hendersonville

Nashville plant relocation
// AL

Birmingham, AL

Hoover · Bessemer · Tuscaloosa

Birmingham plant relocation
// GA

Atlanta, GA

Marietta · Sandy Springs · Roswell

Atlanta plant relocation
// SC

Charleston, SC

North Charleston · Mount Pleasant · Summerville

Charleston plant relocation
// NC

Charlotte, NC

Concord · Gastonia · Rock Hill, SC

Charlotte plant relocation
// FL

Jacksonville, FL

Orange Park · Fernandina Beach · Yulee

Jacksonville plant relocation
// FL

Miami, FL

Hialeah · Fort Lauderdale · Hollywood

Miami plant relocation
// VA

Norfolk, VA

Virginia Beach · Chesapeake · Portsmouth

Norfolk plant relocation
// MD

Baltimore, MD

Towson · Dundalk · Glen Burnie

Baltimore plant relocation
// PA

Philadelphia, PA

Camden, NJ · Chester · Norristown

Philadelphia plant relocation
// PA

Pittsburgh, PA

Monroeville · Bethel Park · McKeesport

Pittsburgh plant relocation
// NY

New York, NY

Newark, NJ · Jersey City, NJ · Yonkers

New York plant relocation
// MA

Boston, MA

Cambridge · Quincy · Worcester

Boston plant relocation
// OH

Cincinnati, OH

Norwood · Blue Ash · Sharonville

Cincinnati plant relocation
// CA

San Jose, CA

Santa Clara · Sunnyvale · Milpitas

San Jose plant relocation
// SC

Greenville, SC

Greer · Mauldin · Simpsonville

Greenville plant relocation
// MI

Grand Rapids, MI

Wyoming · Kentwood · Walker

Grand Rapids plant relocation
// IL

Peoria, IL

East Peoria · Pekin · Morton

Peoria plant relocation
// KS

Wichita, KS

Derby · Andover · Haysville

Wichita plant relocation
// OH

Toledo, OH

Sylvania · Maumee · Perrysburg

Toledo plant relocation
// TN

Chattanooga, TN

East Ridge · Red Bank · Hixson

Chattanooga plant relocation
// AL

Huntsville, AL

Madison · Decatur · Athens

Huntsville plant relocation
// AL

Mobile, AL

Prichard · Saraland · Chickasaw

Mobile plant relocation
// OK

Tulsa, OK

Broken Arrow · Owasso · Sand Springs

Tulsa plant relocation
// IL

Rockford, IL

Loves Park · Machesney Park · Belvidere

Rockford plant relocation
// OH

Dayton, OH

Kettering · Beavercreek · Huber Heights

Dayton plant relocation
// CA

San Diego, CA

Chula Vista · El Cajon · Oceanside

San Diego plant relocation
// CA

Riverside, CA

San Bernardino · Ontario · Fontana

Riverside plant relocation
// GA

Savannah, GA

Pooler · Garden City · Port Wentworth

Savannah plant relocation
// LA

Baton Rouge, LA

Baker · Zachary · Central

Baton Rouge plant relocation
// NC

Greensboro, NC

High Point · Winston-Salem · Burlington

Greensboro plant relocation
// TN

Knoxville, TN

Oak Ridge · Maryville · Alcoa

Knoxville plant relocation
// OH

Akron, OH

Cuyahoga Falls · Barberton · Stow

Akron plant relocation
// IN

Fort Wayne, IN

New Haven · Huntertown · Leo-Cedarville

Fort Wayne plant relocation
// MI

Lansing, MI

East Lansing · Okemos · Holt

Lansing plant relocation
// NY

Buffalo, NY

Cheektowaga · Amherst · Tonawanda

Buffalo plant relocation
// CT

Hartford, CT

East Hartford · West Hartford · New Britain

Hartford plant relocation
// PA

Allentown, PA

Bethlehem · Easton · Emmaus

Allentown plant relocation
// PA

Erie, PA

Millcreek, MO · Wesleyville · Lawrence Park

Erie plant relocation
// VA

Richmond, VA

Henrico · Chesterfield · Petersburg

Richmond plant relocation
// FL

Tampa, FL

St. Petersburg · Clearwater · Brandon

Tampa plant relocation
// TX

Beaumont, TX

Port Arthur · Orange · Nederland

Beaumont plant relocation
// TX

Corpus Christi, TX

Portland · Robstown · Ingleside

Corpus Christi plant relocation
// TX

El Paso, TX

Socorro · Horizon City · San Elizario

El Paso plant relocation
// NV

Reno, NV

Sparks · Carson City · Fernley

Reno plant relocation
// CO

Colorado Springs, CO

Fountain · Monument · Manitou Springs

Colorado Springs plant relocation
// UT

Ogden, UT

Roy · Clearfield · Layton

Ogden plant relocation
// IA

Davenport, IA

Bettendorf · Moline, IL · Rock Island, IL

Davenport plant relocation
// IA

Cedar Rapids, IA

Marion · Hiawatha · Robins

Cedar Rapids plant relocation
// WI

Green Bay, WI

De Pere · Ashwaubenon · Bellevue

Green Bay plant relocation
// IN

South Bend, IN

Mishawaka · Granger · Elkhart

South Bend plant relocation
// KY

Lexington, KY

Georgetown · Nicholasville · Richmond

Lexington plant relocation
// AL

Montgomery, AL

Prattville · Wetumpka · Millbrook

Montgomery plant relocation

Moving the whole floor?

Send the asset list and both floor plans. We'll build the sequence and the schedule.

Get a Plant Relocation Quote