When the whole floor moves, the order is everything. We relocate production lines, machine cells, process equipment, and entire facilities — survey, scope of work, teardown, sequenced freight, reinstall, re-level — planned so your line is down only for the move window, not a day longer.
Quick answer: Plant relocation — also called production facility relocation — is the sequenced move of a manufacturing or process facility with minimal downtime: survey and asset list, a written scope of work, disconnect and teardown, rigging and freight between sites, and reinstall and re-level in the new layout. Badass Logistics runs all of it as one project with one accountable team, not separate rigging, transport, and installation contracts. A plant relocation quote is built from your asset list, both floor plans, the distance between sites, and your production start-up date — send those and we return a written scope of work and quote before anything is scheduled.
A plant move isn't one big lift — it's dozens or hundreds of moves in the right order. Disconnect, teardown, crating, freight, reinstall, recommission. Get the sequence wrong and the new floor sits half-built while production bleeds. Badass Logistics runs the entire project with one accountable team, so nothing falls into the cracks between the rigger, the trucking company, and the installer.
That gap is the single biggest reason a production facility relocation runs long. When rigging, freight, and installation are three separate contracts, no one owns the sequence — the rigger stages crates and moves on to the next job, the truck arrives on its own schedule instead of the install crew's, and if a machine shows up damaged or short a part, three vendors point at each other while your line stays down. One scope of work with one contractor removes that handoff entirely.
We map the path of travel and floor loading at both sites, tear down and label, crate and prep what needs it, and run the loads as project freight on dedicated lanes timed to the crew. At the new building our rigging and machinery moving crews rig and set every machine back to spec in the new layout, with millwright reinstall and alignment on the machines that need it — including the precision CNC machines that have to come back holding tolerance.
New to planning a facility move? Start with our plant relocation checklist, then see how we handle the tricky pieces like re-leveling machines to spec at the new site.
Sequenced teardown, freight, and reinstallation of complete lines.
Multi-machine cells relocated and re-leveled in the new layout.
Tanks, mixers, skids, piping runs, and continuous-process equipment moved and reset in sequence.
Compressors, dust collection, conveyors, and the support gear that moves with the line.
Two floors consolidated into one, or production split out to a new building.
Equipment that isn't making the trip rigged out cleanly so the old building can be handed back.
Equipment secured and staged when the new floor isn't ready yet.
Every relocation plan we build starts at the end: the day the first line has to run in the new building. From there we work backward — which machines are needed first, which utilities have to be live before they land, which pads and anchors have to be ready, and how many days each teardown and reinstall really takes.
Both buildings get walked and measured before anything is scheduled: every machine's weight, footprint, and utility drops; floor loading and slab condition along the path of travel and at the new pad; doorway, aisle, and ceiling clearances; crane hook height and dock access at both ends; and where the new floor plan puts each machine relative to power, air, and process piping. That survey becomes the asset list that drives the rigging plan, the crating plan, and the truck count.
Every machine on the asset list gets a clear line drawn around it: what we disconnect and reconnect as part of the move, and what stays with your electricians, controls integrator, or the OEM's own field techs. Mechanical disconnect, rigging, transport, and mechanical reinstall — setting, anchoring, and leveling — run on our schedule. Utility drops, controls tie-ins, and any startup that requires the OEM's own technician are written into the plan up front and sequenced around our crew, not discovered on move day.
Most plants can't go dark for the whole move, so we plan phase by phase — often line by line or department by department — so part of production keeps running at the old site while the first lines come up at the new one. A single shutdown, where the whole facility comes down at once, is faster end to end but only works when the production calendar allows it and the receiving building is fully ready on day one. We lay out both options against your asset list and start-up date so the trade-off is a decision, not a guess.
Every cable, hose, guard, and fastener gets tagged and photographed before it comes off, cross-referenced to the machine's position on the new floor plan. Floor plan revisions, the asset list, and the punch list are kept as one live set of documents through the whole project, not separate paperwork per vendor. Reassembly at the new site should be a checklist against that record, not a crew trying to remember how something came apart.
A written scope of work is what separates a plant relocation from three vendors doing their own piece of it. Before a single machine moves, the scope of work lays out the asset list with weights, dimensions, and destinations; the disconnect/reconnect boundary for every machine; the rigging plan and equipment needed at both ends; the freight plan and load sequence; the crating and packaging standard for anything shipped; the phased or single-shutdown schedule tied to your start-up date; and the reinstall and leveling spec each machine has to meet before it's handed back.
That scope is what keeps rigging, freight, and installation from becoming three separate contracts with three separate schedules. When one contractor owns the whole scope, a delay in teardown adjusts the freight schedule automatically instead of leaving trucks waiting or crews standing around a machine that hasn't arrived — and if something needs to be re-sequenced mid-project, there's one plan to change, not three.
A relocation is the clearest example of why we run freight at all. Between the rig-out and the rig-in, you might have dozens of truckloads of machines, crated parts, racking, and tooling that all need to arrive in a specific order — not whenever a truck happens to be available.
So the freight is planned with the rigging. Loads are built around weight, dimensions, and install order. Equipment types are matched to the freight — air-ride for precision machines, open deck for tall or crane-loaded pieces, enclosed for crated parts. Transport runs through our licensed broker and carrier partners, usually on dedicated lanes for the length of the move, so the same trucks cycle between sites on a schedule the crews can plan around.
For equipment coming in from overseas or out of storage, we handle container-to-warehouse receiving and staging as part of the same project.
A consolidation is a different planning problem than a single-site relocation. Instead of one asset list moving into one empty building, you're often merging two live production floors — sometimes with overlapping or duplicate equipment — into a receiving building that has to hold both floor plans without exceeding its own floor loading, utility capacity, or aisle widths.
The survey has to answer questions a single relocation doesn't: which duplicate machines actually make the trip and which are decommissioned, how the two production schedules interleave so neither site goes fully dark before the other is ready, and how the combined asset list fits the new building's layout without recreating the bottlenecks either original floor had. We plan consolidations the same way — asset list, scope of work, sequenced rigging and freight, reinstall — but the sequencing has two source floors to reconcile instead of one.
A plant relocation quote isn't a per-mile rate — it's a project estimate built from the same information that becomes the scope of work. Send us the asset list (or let us survey and build one), the floor plans for both the current and receiving buildings, the distance between sites, your production start-up date, and whether the move needs to be phased or can run as a single shutdown.
From there the process is straightforward: a survey call or site walk to confirm the asset list and both floor plans, a written scope of work covering the disconnect/reconnect boundary, the rigging and freight plan, and the reinstall spec, then a project quote against that scope — not a rough estimate that changes once the crew is on site.
Engineered lifts, machine setting, and heavy moves — from a few hundred pounds to 200,000 lbs and beyond.
Industrial Rigging // riggingPresses, generators, compressors, and full production lines — disconnected, rigged, moved, and re-leveled by one crew.
Machinery Moving // riggingMachine installation, anchoring, precision leveling, and alignment — the work that makes a moved machine run right.
Millwright Services // project freightProject cargo and project freight — container to warehouse, crating, and dedicated lanes managed as one plan, never one-off loads.
Project Freight // project freightCustom crates, skids, export packing, and machine prep — done on site by the crew that rigs it out.
Crating & PackingPlant and factory relocation in the country's biggest manufacturing markets — including moves between them. Our own crews and rigging gear, backed by a nationwide network of 88 locations.
Long Beach · Anaheim · Santa Ana
Los Angeles plant relocationOildale · Shafter · Wasco
Bakersfield plant relocationRoseville · Elk Grove · Folsom
Sacramento plant relocationGresham · Hillsboro · Beaverton
Portland plant relocationTacoma · Bellevue · Kent
Seattle plant relocationSpokane Valley · Liberty Lake · Cheney
Spokane plant relocationNampa · Meridian · Caldwell
Boise plant relocationWest Valley City · Sandy · Ogden
Salt Lake City plant relocationHenderson · North Las Vegas · Paradise
Las Vegas plant relocationMesa · Chandler · Glendale
Phoenix plant relocationRio Rancho · Santa Fe · Los Lunas
Albuquerque plant relocationAurora · Lakewood · Commerce City
Denver plant relocationMills · Evansville · Glenrock
Casper plant relocationLaurel · Lockwood · Shepherd
Billings plant relocationWest Fargo · Moorhead, MN · Dilworth, MN
Fargo plant relocationCouncil Bluffs, IA · Bellevue · Papillion
Omaha plant relocationSt. Paul, AK · Bloomington · Brooklyn Park
Minneapolis plant relocationWaukesha · West Allis · Wauwatosa
Milwaukee plant relocationOverland Park, KS · Olathe, KS · Independence
Kansas City plant relocationSt. Charles, IL · Chesterfield · Florissant
St. Louis plant relocationJoliet · Aurora · Naperville
Chicago plant relocationCarmel · Fishers · Greenwood
Indianapolis plant relocationWarren · Dearborn · Livonia
Detroit plant relocationDublin · Westerville · Grove City
Columbus plant relocationParma · Akron · Lorain
Cleveland plant relocationJeffersonville, IN · New Albany, IN · Shepherdsville
Louisville plant relocationPasadena · Baytown · Pearland
Houston plant relocationFort Worth · Arlington · Irving
Dallas plant relocationNew Braunfels · Schertz · Converse
San Antonio plant relocationOdessa · Big Spring · Andrews
Midland plant relocationNorman · Edmond · Moore
Oklahoma City plant relocationNorth Little Rock · Conway · Benton
Little Rock plant relocationMetairie · Kenner · Gretna
New Orleans plant relocationPearl · Ridgeland · Madison
Jackson plant relocationBartlett · Germantown · Collierville
Memphis plant relocationMurfreesboro · Franklin · Hendersonville
Nashville plant relocationHoover · Bessemer · Tuscaloosa
Birmingham plant relocationMarietta · Sandy Springs · Roswell
Atlanta plant relocationNorth Charleston · Mount Pleasant · Summerville
Charleston plant relocationConcord · Gastonia · Rock Hill, SC
Charlotte plant relocationOrange Park · Fernandina Beach · Yulee
Jacksonville plant relocationHialeah · Fort Lauderdale · Hollywood
Miami plant relocationVirginia Beach · Chesapeake · Portsmouth
Norfolk plant relocationTowson · Dundalk · Glen Burnie
Baltimore plant relocationCamden, NJ · Chester · Norristown
Philadelphia plant relocationMonroeville · Bethel Park · McKeesport
Pittsburgh plant relocationNewark, NJ · Jersey City, NJ · Yonkers
New York plant relocationCambridge · Quincy · Worcester
Boston plant relocationNorwood · Blue Ash · Sharonville
Cincinnati plant relocationSanta Clara · Sunnyvale · Milpitas
San Jose plant relocationGreer · Mauldin · Simpsonville
Greenville plant relocationWyoming · Kentwood · Walker
Grand Rapids plant relocationEast Peoria · Pekin · Morton
Peoria plant relocationDerby · Andover · Haysville
Wichita plant relocationSylvania · Maumee · Perrysburg
Toledo plant relocationEast Ridge · Red Bank · Hixson
Chattanooga plant relocationMadison · Decatur · Athens
Huntsville plant relocationPrichard · Saraland · Chickasaw
Mobile plant relocationBroken Arrow · Owasso · Sand Springs
Tulsa plant relocationLoves Park · Machesney Park · Belvidere
Rockford plant relocationKettering · Beavercreek · Huber Heights
Dayton plant relocationChula Vista · El Cajon · Oceanside
San Diego plant relocationSan Bernardino · Ontario · Fontana
Riverside plant relocationPooler · Garden City · Port Wentworth
Savannah plant relocationBaker · Zachary · Central
Baton Rouge plant relocationHigh Point · Winston-Salem · Burlington
Greensboro plant relocationOak Ridge · Maryville · Alcoa
Knoxville plant relocationCuyahoga Falls · Barberton · Stow
Akron plant relocationNew Haven · Huntertown · Leo-Cedarville
Fort Wayne plant relocationEast Lansing · Okemos · Holt
Lansing plant relocationCheektowaga · Amherst · Tonawanda
Buffalo plant relocationEast Hartford · West Hartford · New Britain
Hartford plant relocationBethlehem · Easton · Emmaus
Allentown plant relocationMillcreek, MO · Wesleyville · Lawrence Park
Erie plant relocationHenrico · Chesterfield · Petersburg
Richmond plant relocationSt. Petersburg · Clearwater · Brandon
Tampa plant relocationPort Arthur · Orange · Nederland
Beaumont plant relocationPortland · Robstown · Ingleside
Corpus Christi plant relocationSocorro · Horizon City · San Elizario
El Paso plant relocationSparks · Carson City · Fernley
Reno plant relocationFountain · Monument · Manitou Springs
Colorado Springs plant relocationRoy · Clearfield · Layton
Ogden plant relocationBettendorf · Moline, IL · Rock Island, IL
Davenport plant relocationMarion · Hiawatha · Robins
Cedar Rapids plant relocationDe Pere · Ashwaubenon · Bellevue
Green Bay plant relocationMishawaka · Granger · Elkhart
South Bend plant relocationGeorgetown · Nicholasville · Richmond
Lexington plant relocationPrattville · Wetumpka · Millbrook
Montgomery plant relocationSend the asset list and both floor plans. We'll build the sequence and the schedule.
Get a Plant Relocation Quote