📍 88 locations nationwide  ·  All 50 states  ·  Riggers first
📞 (307) 284-1332  ·  Get a Quote

Dedicated Lanes & Project FTL

When a project needs dozens of truckloads between the same two places, booking them one at a time is how schedules slip. We set up dedicated lanes and truckload capacity for the length of the project — the right equipment, on a fixed cadence, timed to the crews loading and unloading it.

LANE: PLANT A → PLANT B 2 TRUCKS / DAY AIR-RIDE ✓ DELIVERY 06:00–10:00
SAME TRUCKS DAILY LOAD 14 OF 40 WINDOW 06:00

Quick answer: A dedicated lane is truck capacity reserved on a specific route for a set period, instead of booking each load on the spot market. Badass Logistics sets up dedicated lanes and full-truckload capacity for industrial projects — plant relocations, phased equipment deliveries, and recurring runs between warehouses and job sites — through our licensed broker and carrier partners, with delivery windows synced to our rigging crews.

Project capacity, not spot loads

The spot market works fine for one load. It falls apart on a project. A plant relocation might need forty loads over three weeks between the same two buildings. A build-out might take deliveries every morning for two months. Book those one at a time and you get different trucks, different equipment, different arrival times, and a crew standing around waiting for whichever load shows up first.

Dedicated lanes fix that by reserving the capacity up front. We work out how many loads the project really needs, the equipment each type of freight requires, and the cadence the loading and unloading crews can handle — then line up capacity through our licensed broker and carrier partners to run that lane for the life of the project. Same lane, same schedule, often the same drivers who learn the sites.

This is the freight side of our project freight work. We don't sell dedicated capacity for general freight or one-off loads. The lanes exist because a project needs them, and they're planned together with the rigging at both ends.

Dedicated lane management

planning

Lane & Volume Planning

Load counts, cadence, and equipment worked out from the project's asset list and schedule.

equipment

Equipment Matched to Freight

Dry van, air-ride, flatbed, step deck, and conestoga assigned by what each load needs.

ftl

Project Truckloads

Full truckloads for equipment packages and phases that don't need a standing lane.

windows

Delivery Windows

Pickups and deliveries scheduled around the crews loading and setting the freight.

visibility

Tracking & Records

In-transit updates, photos at loading, and signed paperwork for every run.

returns

Round-Trip Planning

Backhauls of empty crates, racking, or tooling planned into the lane where the project allows.

CREW READY ✓ AIR-RIDE STEP DECK — TALL

When a project needs its own lane

Dedicated capacity makes sense when the freight is predictable enough to plan and important enough that a missed truck costs more than the capacity itself. The most common cases:

Plant relocations and consolidations

Many loads between two fixed sites over a set period, sequenced to the teardown and reinstall.

Phased equipment deliveries

A production line, data center, or hospital build-out receiving equipment in a planned order as the site becomes ready.

Warehouse-to-site runs

Staged or devanned freight moving from a warehouse to a job site on a daily or weekly rhythm.

Recurring project loads

Long-running programs with repeat moves between the same facilities, where consistency matters more than chasing the cheapest truck each time.

TARPED ✓ POD + PHOTOS LANE LOCKED

How we plan a dedicated lane

A lane that's planned badly just locks in the same problems. These are the questions we answer before the first truck runs:

For the difference between FTL, LTL, and dedicated capacity, see our guides to LTL vs FTL freight and dedicated freight lanes.

PHASE 2 RUNS NO SPOT BOOKING RETURN LOAD: RACKING

How a dedicated lane runs

  1. Scope the freightAsset list, weights, dimensions, origins, destinations, and the project schedule.
  2. Design the laneLoad count, cadence, equipment mix, and delivery windows tied to the rigging plan.
  3. Secure capacityCapacity committed to the lane through our licensed broker and carrier partners for the project period.
  4. Run the laneLoads move on schedule with tracking, photos, and signed paperwork for each run.
  5. Adjust & close outCadence adjusted as the project changes, then closed out with a complete record.

Projects we run lanes for

Plant relocationsProduction line installsData center build-outsHospital & imaging projectsWarehouse & automation projectsEnergy & utility projectsEquipment OEM programsMulti-site consolidations

Dedicated lanes FAQ

What is a dedicated freight lane?
Truck capacity reserved on a specific route for a set period, instead of booking each load on the spot market. It gives a project consistent equipment, timing, and often the same drivers.
Do you offer dedicated lanes for regular freight?
No. Our dedicated lanes and truckloads are for projects — relocations, installs, build-outs, and equipment programs — planned together with our project freight and rigging work.
Who runs the trucks?
Our network of licensed broker and carrier partners, coordinated inside the project plan. We don't own trucks; we own the planning, scheduling, and coordination with the crews.
What equipment can run on a project lane?
Dry van, air-ride, flatbed, step deck, and conestoga are the most common. Each load is matched to what the freight actually needs.
How many loads does a project need before a dedicated lane makes sense?
There's no fixed number. It depends on how predictable the freight is, how tight the schedule is, and what a missed truck would cost the job. We work it out from your asset list.
Can the schedule change mid-project?
Yes. Cadence and load counts are adjusted as the project moves, which is one of the main reasons to have one team managing the lane and the rigging together.

Related services

Straight answers from our blog

RUN 9 OF 26 ✓ SAME LANE — DAILY

Got a project with a lot of loads?

Send the asset list, the sites, and the schedule. We'll size the lane and the equipment.

Plan a Dedicated Lane