Your machines landed at the port in a steel box, and the free-time clock started the minute it hit the ground. We get the container pulled, drayed to secure staging, and opened by riggers who know a 30,000-lb machine does not come out on a pallet jack. Devanned, inspected, staged, and released to your project on schedule.
Quick answer: Container-to-warehouse service picks up an import container at a port or rail ramp, drays it to a warehouse or staging site, then devans it, meaning the cargo is unloaded, inspected, and staged. Badass Logistics runs it as part of a rigging or project-freight job: drayage through our licensed broker and carrier partners, heavy machines rigged out of the box by our crews, and the empty returned before per diem runs up.
Most drayage outfits see a container as a unit: pull it, drop it, return the empty. That works for cartons. It falls apart when the box is holding a machining center, a press frame, a skid of process equipment, or crated parts that belong to a production line going in next month. Somebody has to get that freight out of an 8-foot-wide steel tube without dropping it, and the dock crew with a standard forklift is usually not that somebody.
That's where we come in. Badass Logistics is a rigging company, and container-to-warehouse work is part of our project freight service. We coordinate the pickup at the port or rail ramp, manage the drayage through our licensed broker and carrier partners, and put a rigging crew on the unload. Heavy machines get jacked, skated, or pulled out on rollers. Light freight gets devanned and checked like it matters, because it does.
We don't take single one-off containers off a load board. This is project work: a plant build-out receiving machinery in waves, a relocation with equipment coming back from overseas, a line install waiting on imported components. The containers, the staging, and the rig-in all run on one schedule, managed by one team.
Containers pulled from ocean terminals and rail ramps on licensed partner drayage carriers, timed to the free-time window.
Heavy machines jacked, skated, or rolled out of the box by riggers instead of forced out with the wrong forklift.
Freight moved from ocean containers into domestic trailers when it has further to go.
Seal checks, door photos, damage and shifted-load notes recorded before anything is signed for.
Equipment held at warehouse partners or on site until the floor, foundation, or crew is ready.
Empties returned to the right location and chassis use tracked so per diem does not creep.
Unloading is where damage gets hidden or found. We make sure it gets found.

Every import container comes with a limited number of free days. Miss the window and two different charges start stacking up, and they come from different directions.
Demurrage is charged while a loaded container sits at the terminal past its free time. It usually can't be pulled until customs, freight, and carrier holds are cleared, so a box can rack up days before anyone is allowed to touch it. We track holds and the last free day so the pickup is booked the moment the container is released.
Once the container leaves the terminal, the clock switches to the ocean carrier's equipment. Keep the box, and sometimes the chassis, past the allowed days and per diem or detention applies until the empty is returned. That's why we plan the devanning date before the pickup, not after the box shows up at the dock.
Receiving staff, rigging crew, and staging space are lined up before the container gates out. When a project has a string of containers landing over several weeks, we sequence them so the floor never gets buried and the empties keep moving back.
The container type decides how the freight comes out, so we confirm it from the booking before scheduling a crew.
Chassis matter too. The container rides a chassis from the terminal, and it isn't always sitting where the box is. Heavy 20-foot containers may need a tri-axle chassis to stay legal on axle weights. Our carrier partners handle the chassis side, and we track it inside the project so a chassis delay doesn't quietly eat the free time.
A heavy machine inside a container is a rigging problem in a tight space. There's no overhead access in a closed box, the floor has a rated forklift axle load, and the machine was usually loaded with blocking and bracing that has to come out in the right order so nothing shifts.
Our crews cut the dunnage, set toe jacks under the base, and put the load on rollers or skates. Then we pull it to the door with controlled force and meet it with the right forklift or a gantry or jack-and-slide setup. Lighter freight comes out with standard forklift unloading. Either way, nothing gets yanked out with a chain and a prayer.
If the equipment is headed straight to its foundation, the same crew can take it the rest of the way: moved in, set, and handed to your installers or our millwrights for leveling.
Custom crates, skids, export packing, and machine prep — done on site by the crew that rigs it out.
Crating & Packing // project freightTruckload and dedicated capacity reserved for the life of a project — same lane, same schedule, synced with the crew.
Dedicated Lanes & FTL // riggingHeavy-capacity forklift work, machine load-outs, and unloading crated equipment from trucks and containers.
Loading & Unloading // riggingPresses, generators, compressors, and full production lines — disconnected, rigged, moved, and re-leveled by one crew.
Machinery Moving // project freightProject cargo and project freight — container to warehouse, crating, and dedicated lanes managed as one plan, never one-off loads.
Project FreightSend the booking, the packing list, and the site. We'll plan the pickup, the unload, and the staging.
Get a Project Freight Quote